Bridge abutments on the new Deebing Creek Bridge project at Ripley QLD were lined with concrete erosion mats to stabilise the slopes and control erosion and runoff. The flexible erosion concrete mats were installed by contractors Davbridge Construction for Ipswich Shire Council and require little to no maintenance. The mats create a safe and hard surface that enables access over sand and into water for vehicles.
Website
Send Enquiry To Australian Concrete Mats