COLLEGE GREEN BERWICK WATERS


Task: Manufacture, supply and install a custom play tower.

Client: ULS Group

End User: College Green Berwick Waters

ULS Group undertook a large landscaping construction project at College Green Berwick Waters. They engaged TRJ Engineering, a preferred playground manufacturer, in order to fabricate the custom playtower, resulting in an attraction popular with young residents at the estate.

SCOPE OF PROJECT

TRJ designed and manufactured custom play equipment based upon architectural drawings. The equipment consists of twin towers, which are connected by a bridge. There are internal climbing platforms, an internal fireman’s pole, and external tyre walls.

Due to the size and shape of the tower, TRJ manufactured the unit in three sections, allowing the company to paint and transport the product to sight. After fabrication, the sections were lifted into position via crane, then joined together on site.

TRJ Engineering installed:

  • All timber slats (internal and external)
  • Internal perforated panels
  • Woven wire window openings
  • Tyre walls
  • Fireman’s pole

The finished unit measures 7.5m long x 2.1m wide x 4.4m high. The frame work was blasted and painted using a three-coat epoxy system. This three-coat system consists of:

  • A zinc rich primer
  • Base-coat
  • Top coats to the customer’s desired colour palette