Notice: This site has recently been refreshed. In order to maintain results, we are completing the work live. This means there will be a short period where trade mark symbols, certain codes, and sequences are being corrected while the new defaults are being rendered. We apologise for any inconvenience.

Search For

Down to the River

Manufactured in Australia from recycled and reclaimed materials, Advanced Plastic Recycling's ecocomp range of WPC products are ideal for large-scale projects, such as this ambitious safe access waterside project.

Down to the River

The new river access project included a safe access walkway, service deck, ramp and landing, all of which lead to a rowing boatshed used by two schools along the Swan River in Claremont, WA.

Vital Building Company was contracted to manage the construction work of this remote and sensitive site. They approached Advanced Plastic Recycling (APR) to custom manufacture and supply their WPC products for the entire project. In addition to this, APR also provided their design and engineering services through every stage of construction.

Down to the River

Throughout the project, the teams consulted closely with the traditional owners of the land and heritage consultants to ensure the project was completed successfully without causing damage.

Down to the River

The project consisted of five stages:

  • Upper-level walkway
  • Lower service deck and associated gabion construction
  • Lower ramp and landing
  • Foreshore gabion construction
  • Foreshore beach replenishment and rehabilitation works

APR custom manufactured and supplied their WPC products for the decking, staircases (including railing and balustrading), ramp, landing and the retention walls. They also supplied products for the sub-frame posts, joists, bearers and stringers.

Down to the River

APR’s eco-friendly WPC products will not rot, rust, splinter or leach chemicals into the environment, making them the perfect long term, environmentally sound solution for this sensitive waterway project.

Down to the River

Through building a successful partnership and collaborating throughout the entire project, APR and Vital Building Services provided an exceptional outcome for their client.

Down to the River

Find out how APR can assist in your next project by contacting them via the links below.

Advanced Plastic Recycling

Advanced Plastic Recycling

Lot 9, 500 Churchill Road, Kilburn , South Australia, 5084

Visit Website

Image Gallery